WeclomeProjectsDocumentationVideoWebcamContact
 

Projects

You can view recent work and see readings from various projects by selecting one of the photo gallery presentations below.

  Dielectric Switch Finger (Video)
  Dielectric Switch Finger
  CRE Shows Apple iPhone / BDI User Interface Compatibility (Video)
  WKQX Line Matcher Installation and RF Sweep Data
  ERI Coax Switch Installation, April 2009
  WKQX ERI Line Matcher, April 2009
  Dr. White performs RF Network Analysis of (1) the ERI Tuning Slug Transmission line, (2) the ERI VHF Coaxial Switch, and (3) the ERI Main Antenna, and their 'system' final impedance load presented to the Shively Combiner Output, March 2009
  Completion of connections of the new ERI 6 Inch coax switch to the output of the Shively Combiner and ERI Tuning Slug Transmission Line, March 2009
  ERI 6-1/8 , 50 VHF Coaxial Switch RF Port-to-Port Sweeps
  Dr. White fully tests the John Hancock Center Combiner ERI 6 Inch Coax Switch for (1) RF bandwidth, (2) Return Loss, (3) Characteristic 50 ohm Impedance, (4) Consistent RF Impedance verses 25 position cycles, and (5) 12 volt external logic control. This photo gallery shows the results and test setup. Dr. White rates the ERI switch "PRISTINE".
  Dr. White shows how the "Degree of Freedom" is related to rotations in the Input Tuning Control on a Tube-Type PA Final Deck, and how small rotational movement creates "Large Scale Deviations" in the PA input impedance and VSWR Load Slope in tube type FM transmitters
  Combiner Dielectric Coax Switch Removal, February 2009
  Dielectric Coax Switch Engineering Evaluation Photo Record, December 2008
  ERI Tuning Slug Transmission Line Sweep Measurements, December 2008
  ERI Power Splitter and Antenna Measurements, November 2008
  Test Calibration of HP 436A Power Meter and Bird Wattmeter, Plus Test Setup Measuring RF Received Power on ALERI Antenna
  Shively Filter Tuning Control Physical Clearance
  Shively Power Hybrid Removal
  ALERI Antenna Measurements
  Transmission Line Pressure Repair (May 2008)
  Station Reject Load Sample and Power Measurements (May 2008)
  BDI Control System
  JHC 97th Floor Tower Light Interface
  Power Measurements (March 2008)
  ALERI Transmission Line Dehydrator
  ERI Transmission Line Dehydrator
  Interlock & Watt Meter Physical Order
  Narrow Band Input Measurements
  HP 8901A AM Noise Measurements
  ERI Controller Installation - Phase 1
  Dialectric Antenna Coax Switch
  Pressure System
  Richland Individual FM Station Measurements
  Richland Measurements
  IBOC Coax Switch Installation
  WLUP Bandwidth
  WKQX Bandwidth
  IBOC Watt Meter Installation
  Generator Computer Interface
  Generator Floor Plans
  93 Floor Automatic Transfer Switch
  ERI Backup Antenna
  West Tower
  Alford Antenna Exterior
  Alford Antenna Tower Feed
  Alford Logic
  Alford Mead Instructions
  Antenna Switch
  Best UPS Removal
  Component Temperature Measurements
  Computer
  FM Station Broadcast Spectrums
  Half Power Controller
  Alford Dummy Load Repair
  Lock-Out: Tag-Out Switches
  Reflected Power Tests
  Safety Switch Covers
  Transmission Line Dehydrator
  UPS Installation
  WLP Protoype RF Sampling